坚韧 诚信 乐观 谨慎 敬畏规律 相信未来
 
 
联系我们

国内销售一部: 0571_64225966

国内销售二部: 0571_64225933

国际贸易部: 0571_64225988

技术研发部: 0571_642259900

后勤保障部: 0571_64225911

财务综合部: 0571_64225922

采购物流部: 0571_64225977

诚招全国代理: 0571_64225999

地址 浙江省杭州市桐庐县横村镇方埠工业区祥和路139号

行业新闻
您的位置:首页 > 新闻中心 > 行业新闻 > 正文

美国Colorado 水电站项目招投标正式启动

发布时间:17-03-29

A new high service water delivery pump station at the East Cherry Creek Valley (ECCV) Water and Sanitation district in Colorado incorporates pump and surge anticipation / relief valves supported by programmable actuators from SIPOS Aktorik.

The membrane water treatment facility, part of the Northern Water Supply Project, uses reverse osmosis treatment equipment to purify well water. Three sets of pump control valves and two surge anticipation relief valves have been supplied by Pipestone Equipment: each set includes a vertical turbine pump with capacity over 4,000 gpm and a 16” ValMatic rubber seated ball valve with SIPOS variable speed actuator.

Having adopted SIPOS’ actuation technology for valve control installations since 2006, Pipestone Equipment was assured of the actuators’ capability to gradually control water to the pipeline during pump startup and normal shutdown: each actuator supplied has been specifically programmed to operate the ball valve for each project to create a linear acceleration and deceleration of the water during operation.

The installation is the latest in a series of applications of SIPOS actuators at ECCV: in 2007, the company’s products were chosen for their ability to prevent water hammer for a booster pump station

 

坚韧 诚信 乐观 谨慎 敬畏规律 相信未来

浙公网安备 33012202330644号

Copyright 1999 @ XUVAL 浙ICP备17008180号